Beach silt soft foundation
Market pain points/problems:
How to do when silt soil impassable and can not be mechanical construction causing difficult to construct?
How to do when silt fluidity is too large to excavate causing foundation collapse? Is Silt is not solidified and the curing time is long, wait to dry in the sun ? How to deal affecting the construction period?
How to harden silt rapidly in high salt and alkali environment ?
Soft silt clay harden in 5 hours
fast hardening high strength can withstand 7 tons of load in 10 hours
Technical features:
1. fast hardening speed, can pass heavy machinery in 5 hours.
2. a wide range of application, widely used in expansive soil, high alkaline and strong acid soil.
3. easy to operate, can effectively reduce the construction period