YY16 flash set slurry


YY16 flash set slurry, a new rapid plugging material, studied and developed by Zhengzhou Sainuo Building Materials Co., Ltd. YY-16 is non-shrinkage, non-metallic and non-corrosive, only mix with tap water, can be hardened within 45 seconds, even also can be quickly hardened under water, used for concrete and masonry structure blocking water flow instantly.

Classification:


Products

YY16 flash set slurry, a new rapid plugging material, studied and developed by Zhengzhou Sainuo Building Materials Co., Ltd. YY-16 is non-shrinkage, non-metallic and non-corrosive, only mix with tap water, can be hardened within 45 seconds, even also can be quickly hardened under water, used for concrete and masonry structure blocking water flow instantly.

The material has fast solidification speed (30-60 seconds), high compressive strength, good permeability and crack resistance. can not only stop water plugging with water and pressure , but also can be used for underwater plugging treatment.

YY16 flash set slurry

Product features

1. fast solidification speed, short initial setting time, less than 45 seconds, can solidify in 30-60 seconds at the normal temperature, fast water-stop speed, suitable for large water pressure and water leakage (ordinary plugging king’solidification speed is slow, about 1-5 minutes , bad effect for large water leakage and big water pressure)

2. high strength, strong adhesion, limited expansion, No cracking (ordinary plugging king is easy to crack, not combined and separated with concrete base, occur compound leakage)

3. Excellent waterproof and impermeability , not easy to compound leakage later(ordinary plugging king is easy to slow seepage)

4. can adjust the solidification time according to the situation on the scene, better long-term waterproof and impermeable performance

Scope of application

1. all kinds of water leakage plugging treatment of engineering construction

2. water leakage that can not be treated with ordinary plugging king

Keywords:

flash set slurry

Previous:

Next:


Mines green

Water Conservancy Project

Pipeline construction applications

High Standard Farmland


关闭视频

Application Videos

关闭视频

Application Videos2

关闭视频

Application Videos3

关闭视频

Application Videos4

Message