Roads Construction
River slope protection water conservancy project
Self-cleaning function water body no odor breathable non-toxic and environmental protection
Mines drift filling
Mines slope protection (can grow grass without being washed away) green carbon sink
Soil diagenetic deep foundation pit and soft foundation treatment
Soft foundation treatment can bear 7 tons of load in 10 hours. Instead of replacement filling.
Fill fertilizer tank and foundation tank with fluid diagenetic soil, can be waterproof, impermeable and reinforced
Soft silt clay harden in 5 hours
fast hardening high strength can withstand 7 tons of load in 10 hours